Matt or satin
The default for working areas. Hides scuffing and tyre marks, reduces glare under high-bay lighting, and shows dust far less than gloss.
A floor specified around forklift loads, impact, thermal shock and the chemicals you actually use — not around how it looks in a photograph. We survey the slab, size the system to the duty, and programme the work around your production schedule.
Industrial epoxy flooring is a performance specification before it is a finish. In a production hall or a warehouse nobody is buying gloss — they are buying a surface that survives what runs across it, keeps cleaning simple, and does not start breaking up eighteen months after handover. So the system is chosen from the back: we start with the duty and work forward to the build-up.
Five things drive that decision. Point loads from racking legs, machine feet and stillages. Wheeled traffic from forklifts, pallet trucks and trolleys, and in particular where they turn and brake. Impact from dropped tooling, stock and drums. Thermal shock from hot washdown, steam cleaning or process heat. And chemical exposure — the specific substances used in your building, not a general category. Get those five right and the rest of the specification follows.
Epoxy is a family of resin systems, not one product. A two-part chemistry — resin plus hardener — reacts on site, and performance comes from the combination of primer, body, aggregate, thickness and topcoat. Two floors that look identical can behave completely differently under a loaded forklift.
Thickness is the single clearest lever on durability, and it is also the single clearest lever on price. There is no free upgrade here.
Where an area is permanently wet, steam-cleaned or subject to hot and cold cycling, a polyurethane-cement screed is often the better answer than epoxy. It tolerates temperature swings that will debond a standard epoxy system over time. If that is what your area needs, we will tell you, even though it is a different product line from the decorative work we are better known for.
This system suits operators who measure a floor by downtime, not by appearance. It is the right conversation if any of the following is true of your site.
Most industrial buildings are not one environment. A single site can need three different specifications: a mortar in despatch, a slurry through the production hall, and a straightforward coating in stores. We zone the building during the survey rather than quoting one rate across the whole area.
Industrial floors are usually solid colour in a matt or satin finish. That is a deliberate choice, not a compromise: a lower sheen hides scuffing and tyre marking far better than high gloss, and it cuts glare under high-bay lighting. Colour is normally used to do a job — a light body colour to lift light levels, a contrasting colour for walkways, yellow for hazard zones and bay edges.
Our epoxy floors cure into one continuous surface with no joints, no grout lines and nowhere for water to seep through. Spills, mopping and washdowns are handled easily — ideal for bathrooms, kitchens, commercial kitchens and wash areas.
Before installation we assess the slab for rising moisture. Where moisture is present we specify a moisture-tolerant primer or barrier system so the floor performs long term. This assessment is part of every free site inspection.
These are the trade-offs we raise before you sign, because they are the ones that cause arguments later if nobody mentions them.
Surface preparation is the single biggest quality factor in a resin floor. We mechanically grind every slab to open the surface so the primer can bond, and we do not coat over dust, laitance or an untested substrate. On industrial work the sequence runs like this.
Coving. In washdown areas the floor should turn up the wall as a formed cove so there is no square junction for water and residue to sit in. It costs extra per linear metre and it is the detail most often value-engineered out — and then missed.
Line marking and demarcation. Lanes, pedestrian walkways, racking bays and hazard zones can be built into the floor as resin markings rather than applied tape. They survive forklift traffic and cleaning; tape does not.
Anti-slip broadcast. Smooth resin is slippery when wet. Where forklifts brake, on ramps, and anywhere the floor gets wet, we broadcast a graded aggregate into the coat to build texture. The trade-off is honest: more texture means better grip and slower cleaning, so we set the level per zone rather than across the whole floor.
Shown top to bottom, as the floor is seen and then as it is built.
Industrial rates start from Rs. 570 per sqft for a straightforward system on a sound slab, and heavy-duty specifications sit well above that. Treat any figure before a site visit as indicative only — the table below is what actually moves the number.
| Cost factor | Why it moves the price | Effect |
|---|---|---|
| System thickness | Coating, slurry or mortar. Material volume and application labour rise together as the duty rises. | Largest single driver |
| Slab condition | Grinding a sound slab is routine. Spalling, delamination, oil contamination or deep cracking adds repair work before any resin is laid. | Increases |
| Total area | Mobilisation, plant and set-up are spread across the area. Small isolated rooms carry a higher rate than one large hall. | Larger area, lower rate |
| Chemical exposure | A resistant specification for aggressive chemicals uses a different, more expensive chemistry than a general-duty floor. | Increases |
| Thermal duty | Hot washdown, steam or thermal cycling points to a polyurethane-cement screed rather than a standard epoxy. | Increases |
| Coving and detailing | Priced per linear metre. Plinths, drains, channels, thresholds and pipe penetrations are all hand work. | Increases |
| Joint treatment | Movement joints must be carried through the finish with the correct profile and sealant. | Increases |
| Line marking | Lanes, walkways, bays and hazard markings are set out and applied as separate operations. | Increases |
| Anti-slip finish | Aggregate broadcast plus an extra lock-in coat over the zones that need texture. | Modest increase |
| Access and shift working | Night work, weekend possessions, live-plant phasing and restricted access all extend the programme. | Increases |
| Location | Sites near an office carry lower mobilisation than remote single-visit projects. | Varies |
A contained industrial area — a workshop, a store, a single bay — is typically a three to five day operation including preparation, coats and cure. A full production hall or warehouse is planned in zones so part of the building keeps working while another part is closed. The realistic constraint is rarely our speed; it is how much floor you can release at once.
Preparation usually takes longer than people expect and application takes less. Grinding, crack repair and joint work on a tired slab can occupy half the programme. Once priming starts, the coats follow on a fixed rhythm dictated by the resin, and that rhythm cannot be compressed by adding people.
Return-to-service time is system-specific. Foot traffic, wheeled traffic and full chemical service each become available at different points, and the intervals differ between a thin coating and a thick mortar, and shift again with site temperature and humidity. We confirm the actual figures for your specified system in the quotation, in writing, before you plan the shutdown around them.
An industrial resin floor is low maintenance, not no maintenance. What keeps it performing is routine and unglamorous.
Once the system is sized to the duty, these are the choices left to make. Each one is set per zone, not once for the whole building.
The default for working areas. Hides scuffing and tyre marks, reduces glare under high-bay lighting, and shows dust far less than gloss.
Reserved for showroom bays, plant offices and visitor routes where appearance matters and traffic is light. It marks more readily.
Graded aggregate worked into the surface for ramps, braking zones and wet areas. Texture is set per zone to balance grip against cleaning effort.
Traffic lanes, pedestrian walkways, racking bays and hazard markings applied in resin so they survive forklifts and scrubbing.
The floor turned up the wall as a formed cove at junctions, plinths and around drains — the detail that makes a washdown area genuinely cleanable.
Epoxy can amber under direct sunlight. Where rooflights or open shutters expose the floor, a UV-stable topcoat is available where specified.
We have been installing resin floors since 2012 — fourteen years and more than 1,200 floors, with offices in all major cities and service all over Pakistan. A good part of that work has been replacing industrial floors that were specified too thin, laid over an untested slab, or coated straight across a live movement joint. It is why we survey before we quote.
Tell us the area, the traffic it takes and what gets spilled on it. We will survey the slab, zone the building and come back with a fixed written specification and price.